Lima, december 2019. Currently the line 1 is the only line operating and the line 2 is under construction.
Tekia has completed for the AATE (Autonomous Authority of the Lima and Callao Electric Transport System) the drafting of the renewal project for the collection system of Line 1 of the Lima and Callao Metro, along with specialized technical assistance to ensure interoperability with the collection system of Line 2 and branch line 4.