News

Search our Site

Madrid, june 2020. ITS Iberoamerica organises the III Iber-American Congress (1-3 june). TEKIA sponsors the event and participates in 4 sessions. Due to the current Covid-19 health crisis this edition will be 100% online.

Bogota, may 2020. In the frame of the Bloomberg Philanthropies Global Iniciative, the World Bank´s Global Road Safety Facility has commisioned TEKIA to assist to the The Secretariat of Mobility of Bogota its methodology to prioritize locations of new traffic lights, to include road safety criteria in the decision-making process.

Basque Country, April 2020. The TEKIA-IDOM consortium (UTE RS 2018) has extended its work as Safety Officer of the tunnels managed by Bidegi in the historical territory of Gipuzkoa until April 2022.

Mexico, April 2020. TEKIA has finished the expert report on the Operation and Maintenance Long-Term Programme (LTP) for the concession period (2020-2051), OPEX.

Pamplona, March 2020. The technological renovation project is currently in its final certification stage, after a successful deployment in Pamplona's Regional Urban Transport fleet.

Barcelona, march 2020. The office is located in Rambla of Catalunya, one of the city's main streets.

Madrid, february 2020. The World Bank awards to the Joint Venture TEKIA / Braxton, Technology assessment for Data management & Road safety enhancement in Ecuador and Pilot in Quito project.

Madrid, january 2020. In this audit, the certification of ISO 9001: 2015 and ISO 14001: 2015 standards has been renewed and the migration from OHSAS 18001 to ISO 45001: 2018 has been successfully carried out.

Lima, december 2019. Currently the line 1 is the only line operating and the line 2 is under construction.

Barcelona, december 2019. With this contract, TEKIA will design a new multi-fleet AVLC System to be used by the intercity bus operators in the Metropolitan Region of Barcelona.

Madrid (Spain) September 2019. Madrid Council has awarded to the Efibus system with the “Muévete Verde” award in the energy efficiency category. This system is being implemented by the joint venture ETRA-TEKIA in 1000 EMT buses after a pilot test along 2018, in which had achieved very satisfactory results in fuel consumption savings.

Barcelona (Spain) September 2019. Infraestructures Municipals, S.A. BIMSA, responsible for the construction and exploitation of the road tunnels Les Glòries, has commissioned TEKIA the Operating Manual during the operation phase of those tunnels. The opening to traffic is scheduled by first quarter of 2021.

Mexico, September 2019. The company responsible of the construction, operation and maintenance of the Circuito Exterior Mexiquense beltway, has commissioned TEKIA the diagnosis and the upgrade of the toll systems of the main toll stations.
Additionally, TEKIA will develop a solution for the extension and redesign of the 7 main toll stations.

Madrid, Spain, July 2019. TEKIA design the facilities renewal for the operation, monitoring and area control of the parkings managed by SerranoPark, S.A.

June 2019. TEKIA, as tunnel safety expert, continues contracting projects related to ventilation and safety in rail and road tunnels both in Spain and other countries around the world.